How to track remedial actions for a site

Remedial Actions in the site menu lists the physical jobs raised against the open site — from non-conforming results or added directly.

Steps

  1. Use the filter to scope the list (status, date, type).

    The site remedial actions list with a filter and update controls
    Site remedial actions. — screenshot pending
  2. Open a remedial to record progress — a note, a job number, a target date.

  3. When the work is done, set it to a completed / authorised status. It then drops off the outstanding list and the planner chip.

Opened from the planner

The Remedials chip on the site planner opens this same list already filtered to what is outstanding.