| To be BS8580 compliant the service provider needs to: - | To be compliant with the LCA service standard the provider needs to: - | L8MS Risk Software | 
| …. The scope of the risk assessment, including identifying the systems that are to be assessed and those that are not to be assessed… | Clarify in writing the scope of service, which buildings / premises and water systems are to be included. | You need to ensure your quotation system encompasses these points to be BS8580 and LCA service standard compliant.
 | 
| ….Whether a schematic has to be prepared or redrawn as part of the assessment and, if so, its form and its coverage.... | Arrangements with respect to schematic drawings and whether they are included. | 
| NA | Confirmation as to whether an asset register of outlets will be produced. | 
| NA | Enter into a written agreement with the client. | 
| ….. Before commencing a site visit, the assessor should  undertake an assessment of the risks of the site survey. All hazards, their assessment and the precautions planned and taken should be recorded……. | Carryout out a pre-work risk assessment | 
| .…they should be able to demonstrate that they have specialist knowledge of Legionella bacteria, relevant water treatment and the water system(s) to be assessed, and are competent to carry out any necessary surveys, measurements and sampling…… | Produce written evidence in support of the competence of the assessor to carry out the specified work
 | Assessor details can be stored against each risk assessment
 | 
| ....The scope of the risk assessment, including identifying the systems that are to be assessed and those that are  not to be assessed.... | Identify all systems | System identification survey. | 
| …. If a current risk assessment is available, it should  be appraised by the risk assessor to determine if it is still valid and to identify any changes…. | Inspected the previous risk assessments where one exists
 | Forms part of the management survey | 
| ....If any of these adverse conditions are  found, remarks would be made in the assessment.... ....It is normal for such adverse conditions in the assessment to be supported by photographic evidence....
 | Inspect and determine the condition of systems assessed
 | System specific survey forms & Photographic records | 
| ....The survey  involves practical inspection of the whole system, not just the tanks and calorifiers. During  the inspection the assessor is looking  for any elements of the design, construction or operation which could lead to conditions under  which Legionella would be expected to multiply.... | Take into account the contribution to risk made by the design, construction, and operation of the system | System specific survey forms | 
| ….An appraisal of the current risk assessment, together with the logbook or other records, e.g. monitoring records, should be carried out to determine whether the system is under control and is continuing to be adequately managed….. | Review the written scheme, considering its effectiveness
 | Forms part of the management survey | 
| ... The risk assessor should appraise any records of the scheme of maintenance and control that have been implemented for the water systems…. | Review monitoring and inspection records
 | Forms part of the management survey | 
| ….The site inspection should include speaking to management and staff to allow the assessor to judge the effects of the management culture and work practices of the organization in adding to (or reducing) the risk….
 | Assess the ability of management to control the risk
 | Forms part of the management survey | 
| Assess the competence of site staff and contractors to control the risk.
 | Forms part of the management survey | 
| ....The report should be readily understandable by the people for whom it is intended and, most importantly, be clear and unambiguous in its findings  and recommendations.... | Produce an executive summary as part of the report | Available in the full report or standalone. | 
| ....The report should be concise,  clearly explain the scope of the assessment, identify the key people, including the duty holder and the responsible person.... | The report should define the scope of the assessment
 | Defined in the report overview | 
| ....identify the key people, including the duty holder and the responsible person,… | The report identify key site staff and contractors
 | Can be included as a document or a survey | 
| ....It is important that all schematics drawings identify the date when they were last reviewed and updated. The name (initials) of the individual and their organization ought also to be recorded. Where required, a legend detailing any symbols or abbreviations ought to be included on the schematic.... | Refer to schematic drawings, or the need for their production | Can be uploaded and stored with the assessment
 | 
| NA | Give the results of condition surveys
 | Available in the full report or standalone | 
| ....Where a scheme of control is in place, the risk assessor should undertake a detailed appraisal and audit of the scheme and report on its adequacy.... | Report on monitoring and inspection records in the light of operating parameters
 | Available in the full report. | 
| ….Legionella risk assessments may contain a “risk scoring system” or “risk algorithm” as an aid to understanding the relative risk of the systems assessed. However, any scoring system used by the risk assessor should be explained to the intended reader…. | Evaluate the risk and explain how the risk rating is derived | Simple defined risk rating system | 
| ....The recommendations should be prioritized, ideally with an indication of timescales.... | Make time-scale prioritised recommendations on corrective actions to reduce the risk
 | Findings reports | 
| ....For site and system-specific control measures (monitoring, inspection and treatment), including the identification of sentinel outlets or other relevant sample and inspection points.... | Recommend site and system specific control measures (monitoring and inspection schedules)
 | Site specific auto generated control measures
 | 
| NA | Indicate the date of the next review of the risk assessment
 | The need is confirmed in the assessors comments
 | 
| NA | Indicate any limitations of the assessment
 | Defined in the management section | 
| ….If the assessor identifies an imminent danger of exposure to Legionella, e.g. failure of a biocide dosing system or a previously unidentified water system, or one which falls outside the scope of their brief, they should report this immediately to the responsible person or their site representative, and not keep this for the written report…..
 | Indicate any matters of evident concern beyond the scope of the assessment
 | Can be included in the executive summary | 
| ….The risk assessor should be able to demonstrate impartiality and integrity when carrying out surveys of legionellae in premises…. | NA | You need to ensure your control system encompasses these points to be BS8580 and LCA service standard compliant
 |